| Commercial Office / Medical
/ R&D Projects (partial listing) |
|
| Keyspan Energy -
West Roxbury, MA -- Repeat client
|
Demolition of 5,000SF steel mezzanine. Selective demolition and 8,000 SF buildout of offices
new locker rooms, and bathroom core.
|
|
20,000 SF interior demolition / office and computer lab buildout for technology testing firm.
|
|
25,000 SF office, lab, computer room buildout for hi-tech software firm.
|
|
| Planet Gymnastics - Natick, MA
|
Electrical / Mechanical systems upgrades to base building as well as a 20,000 SF buildout
for gymnastics academy. Gym floor with vault pits, party rooms, new offices and reception area.
|
|
| SBH Sciences - Natick, MA
|
5,000 SF selective demolition and office and lab buildout for life sciences firm.
|
|
| Contour Networks - Billerica, MA
|
8,000 SF buildout of labs and offices for semiconductor firm.
|
|
| East / West Mortgage -
Peabody, MA
|
|
New 36,000 SF, three story office building for leading mortgage lender
in New England. Structural steel frame,= E.I.F.S. exterior, tinted glass, dome
and pyramid skylights, circular stairway and elevator.
The interior features raised access flooring and demountable walls throughout
to offer maximum flexibility.
|
|
| The Arsenal on the Charles
- Watertown, MA
|
|
Multiple base building renovations and infrastructure upgrades
within complex as former armory is redeveloped into 700,000
SF of first class office space. Work included upgrade
of M/E/P building systems, new elevator and shaft, bathroom
cores, common areas and buildout. Owner - O'Neill Properties Group -
Repeat Client |
|
| Bluestone Holdings
- (100 Wells Ave.) Newton, MA
|
|
Base building infrastructure improvements and tenant buildout
for repeat client and building owner Bluestone Holdings. The
scope of work included selective demolition, new mechanical
and electrical systems, new elevator and shaft, common area
upgrades, bamboo flooring, extensive glass and finishes throughout.
The project also included a complete buildout for tenant Brecher,
Wyner, Simons & Bolan.
Repeat Client |
|
Action Inc.
- Gloucester, MA
|
|
Demolition and buildout of 6,000SF offices / admin / kitchen area including the installation of new
elevator, replacement of electrical / mechanical systems infrastructure.
|
|
| Extraction Systems - Franklin,
MA
|
|
38,000 SF buildout of research and development facility
including labs, computer room, offices and common areas. |
|
| Bluestone Holdings
- (70 Wells Ave.) Newton, MA
|
|
Base building infrastructure improvements, common area renovations
and tenant buildout for building owner Bluestone Holdings. The scope of work
included selective demolition, new drywall, doors and frames, flooring and finishes
throughout, as well as common area renovations. The project also included a
complete buildout for tenants Friedman, Suvalle, & Saloman, P.C. and Neurocare.
Repeat Client
|
| Oxigene Corporation -
Watertown, MA
|
|
10,000 SF office / R&D buildout at the newly redeveloped Arsenal on the
Charles. Oxigene is an international biopharmaceutical company that develops innovative products to
combat cancer and other major diseases.
|
|
| Department of Social Services
- Springfield, MA
|
|
28,000 SF selective demolition and buildout of existing
building. |
|
Trader Joe's Corp. office
(117 Kendrick Street) - Newton, MA
|
|
10,000 SF corporate office buildout and test kitchen for national specialty food supermarket
chain. Completed multiple projects for this Repeat Client
|
|
Input / Output Systems
- Brighton, MA
|
|
Construction management contract to buildout new 9,000 SF building including offices, bathroom cores, and elevator.
Design/Build MEP. |
|
|
Three-phase buildout within occupied space to be done both days and
off-hours to accommodate AAA clients and employees.
|
|
Stream International
- Canton, MA
|
|
Phased construction projects for high-tech software firm within
occupied space.
|
|
Hyster New England
- Billerica, MA
|
|
26,000 SF buildout project for sublet tenant.
Office, new ADA compliant bathrooms, and upgrades to warehouse.
|
|
| Paine Webber - Sandwich, MA
|
|
Selective demolition and 10,000 SF phased office fit-up for investment firm.
|
|
| New England Cable News
(NECN) - Newton, MA
|
|
Reinforcement and addition of structural steel to support extensive
communications equipment on the roof.
Owner - Bluestone Holdings
Repeat Client
|
|
|
Buildout of new studio for a city controlled community access cable TV station. 7,000 SF
phased construction project within Beverly High School. The completed space will house BevCam
offices, a modern three-camera studio and smaller auto pilot studio. Construction of the autopilot
studio will allow one person to operate the cameras and host a show at the same time.
|
|
| Horizons Technology
- Billerica, MA
|
|
13,000 SF phased renovation project within occupied space.
|
|
| Foley & Buhl
- Newton, MA
|
|
Office renovation projects for property owner/manager Northland Development.
|
|
| Converter Power - Beverly,
MA
|
|
22,000 SF selective demolition and buildout of existing
R & D facility.
|
|
| Healthcare Projects
(partial listing) |
|
| Wingate at Andover
- Andover, MA -- Repeat client
|
|
12 bed / 8,000SF two story addition/renovation project at assisted-living/skilled nursing facility.
|
|
| Palm Manor
- Chelmsford, MA
|
|
Five phase interior buildout of existing nursing home for owner Genesis Healthcare.
|
|
| DaVita Healthcare
- Medford, MA -- Repeat client
|
|
Complete interior demolition and 10,000 SF buildout for new dialysis treatment center for
national provider DaVita Healthcare. Extensive trenching, mechanical systems upgrades, in ground
electronic scale and millwork.
|
|
| Dental office buildout
- Chestnut Hill, MA
|
|
5,000 SF demo and buildout of dental offices (15 chairs) including conference areas, labs,
exam rooms and childrens play area. Extensive plumbing and high-end millwork and finishes
throughout.
|
|
| Atlanticare Medical Services
- Lynn, MA
|
|
Healing Atrium addition and buildout of Women's Wellness Center. |
|
Gambro Healthcare
Salem, Brookline, New Bedford, Burlington, MA
|
|
Buildout of dialysis areas, administration offices, reception area, mechanical and
electrical systems upgrades, and new waterproof floor system. Performed in conjunction
with project management firm Holladay Properties.
Repeat Client
|
|
| Dental office buildout
- Chestnut Hill, MA
|
|
5,000 SF demolition and buildout of dental offices (15 chairs) including conference areas, labs,
exam rooms and childrens play area. Extensive plumbing and electrical work within exam rooms,
high-end millwork and finishes throughout. Architect - King Design.
|
| Fresenius Medical
- Ludlow, MA
|
|
Selective demolition and interior buildout of regional kidney dialysis center for international health
care services provider.
|
| Retail Projects
(partial listing) |
|
24,000 SF new retail / warehouse building. Two level structure with European ski lodge
accents. Extensive retail space on first floor along with administration offices. Hydraulic materials
lift to temperature controlled warehouse on second floor. Steel frame, masonry, specialty lighting,
retail finishes, stonework, glass, and metal roof.
Architect - Udelsman Associates.
|
|
Burlington Coat Factory
- Stratford, CT
|
|
88,000 SF buildout for clothing and accessories retailer.
Repeat Client |
|
|
25,000 SF construction project for pet supplies retailer. |
|
Burlington Coat Factory
- Providence, RI
|
|
74,000 SF buildout for clothing and accessories retailer.
Repeat Client |
|
Office Depot - Newington,
CT
|
|
29,000 SF selective demolition and re-construction
for national office supplies retailer.
Repeat Client |
|
Office Depot
- Warwick, RI
|
|
28,000 SF buildout for national office supplies retailer.
Repeat Client
|
|
27,000 SF buildout for national office supplies retailer.
Repeat Client
|
|
25,000 SF buildout for national office supplies retailer.
Repeat Client
|
|
25,000 SF buildout for national office supplies retailer.
Repeat Client
|
|
Design/Build fit-up for the TJX Companies.
Repeat Client
|
|
Kitchen, Etc. - Manchester,
NH
|
|
Buildout for kitchen supplies store in the Mall of New Hampshire. |
|
O'Connor True Value Hardware
- Billerica, MA
|
|
50,000 SF complete gut and re-construction of former
Purity Supreme. Client: Finard & Company |
|
|
5,000 SF new construction for national autoparts retail / warehouse.
|
|
|
5,000 SF new construction for national autoparts retail / warehouse.
|
|
|
Addition of car prep area, bathroom core and break area for owner Boch Enterprises.
|
|
|
3,000 SF renovation including new drive-up window for upscale drycleaner.
|
|
Talbot's
- Marblehead, MA
|
|
4,000 SF fit-up for national chain of upscale, women's clothing.
|
|
| Countrywide Home Loans
- Salem, NH -- Repeat Client
|
2500 SF fit-up for national mortgage lender.
|
|
| Restaurant / Food Service
Projects (partial listing) |
|
Boston Market - Fall River, MA
|
4,000 SF new construction for national, specialty food restaurant chain.
|
|
Quiznos - Medford, MA --
Repeat Client
|
2,000 SF buildout of specialty sandwich restaurant for national chain.
|
|
Know Fat/UFood - Boston, MA
|
3,200 SF restaurant buildout for expanding, low fat specialty foods chain.
|
|
Applebee's - Pittsfield,
MA
|
|
5,000 SF, ground-up family-style restaurant. All trades
including sitework, utilities, food service equipment, extensive
millwork, seating. |
|
Trader Joe's - Boston,
MA
|
|
5,500 SF buildout of specialty food store for expanding
national supermarket chain. All trades including new plumbing,
mechanical, electrical systems and food service equipment.
Repeat Client
|
|
7,500 SF buildout of new shell, scope of work as indicated above.
Repeat Client
|
|
Trader Joe's
- Hingham, MA
|
|
7,500 SF buildout of new shell, scope of work as indicated above.
Repeat Client
|
|
KFC / Taco Bell
- Stoughton, MA
|
|
Complete interior and selective exterior demolition of existing
restaurant and construction of new fast food restaurant. All
trades including sitework and utilities, M/E/P systems, E.I.F.S,
roofing, and interior finishes, as well as placement and hook-up
of food service equipment .
Owner: Tricon (Yum! Brands)
Repeat Client
|
|
Complete interior buildout of take-out pizza restaurant. Extensive
plumbing, HVAC, electrical systems, and interior finishes, as
well as placement and hook-up of food service equipment .
Owner: Tricon (Yum! Brands)
Repeat Client
|
|
|
3,200 SF restaurant buildout for expanding, low fat specialty foods chain.
|
|
New construction of 3,200 SF ground-up fast food restaurant.
|
|
Demolition of existing restaurant and new construction of 3,200
SF ground-up fast food restaurant. All trades and food
service equipment.
Repeat Client
|
|
3,000 SF ground-up fast food restaurant. All trades
and food service equipment.
Repeat Client
|
|
3,000 SF ground-up fast food restaurant. All trades
and fast food service equipment.
Repeat Client
|
|
White Hen Pantry - Harwich,
MA
|
|
2,300 SF ground-up convenience/fast food restaurant. |
|
Dunkin' Donuts - Andover,
MA
|
|
2,300 SF renovation including casework and food service
equipment.
Repeat Client
|
|
Dunkin' Donuts - North
Andover, MA
|
|
2,200 SF renovation. Interior renovations and installation
of food service equipment.
Repeat Client
|
|
Dunkin' Donuts - Taunton,
MA
|
|
Complete gut and reconstruction of 2,500 SF restaurant.
Repeat Client
|
|
BJ's Wholesale
- Danvers, MA
|
|
Bakery and Pharmacy renovations within occupied space.
Repeat Client
|
|
BJ's Wholesale -
N. Attleboro, MA
|
|
Bakery and Pharmacy renovations within occupied space.
Repeat Client
|
|
|
2,100 SF renovation. Selective demolition, new entrance,
extensive millwork, paint, floor tile, and installation of food
service equipment. |
|
Open remodels.
Repeat Client
|
|
Non-profit Projects |
|
|
3,000 SF renovation/addition project for developer
Continental Wingate, the City of Newton and tenant Second Step.
Second Step is an upscale housing complex for women and their
children in need of shelter. The residence is complete with
nine private bedroom / bath suites, full-service kitchen complete
with kosher area, living room, study, play area, and administration
offices in lower level. The scope of work included complete
interior demolition, lead and asbestos abatement, new mechanical
and electrical systems, slate roof, new windows, walls, flooring,
extensive millwork & finishes, and landscaping of the grounds. |
|
Montachusett Opportunity Council - Leominster, MA
|
Fast-track project - selective demoltion and buildout of 30,000SF of classrooms, labs and
training areas for community services organization.
|
|
Action Inc. - Gloucester, MA
|
|
High-end buildout of 6,000 SF offices, conference rooms, computer training and lab research area,
and full service kitchen, new elevator, replacement of electrical and mechanical systems
infrastructure.
|
|
Pipestave - West Newbury, MA
|
|
Complete interior demolition and buildout of a four unit low income complete interior
demolition and buildout of a four unit low income housing building.
|
|
River House - Beverly, MA
|
|
Complete interior demolition and buildout of existing community shelter.
|
|
Toward Independent Living & Learning Home - Lowell, MA
|
Construction of new 2,800 SF handicap accessible home.
|
|
Holden Block - Webster, MA
|
|
Interior and exterior renovation for a seven unit low income housing complex.
|
|
| Skating Rinks |
|
NHL Skate / Sports Center
- Exeter, NH
|
|
Design/Build construction of 80,000 SF twin ice rink
/ sports complex. Mondo sports flooring, pro shop, restaurant,
arcade, nine locker rooms.
Architectural services by Design Forum. |
|
Conway Arena
- Nashua, NH
|
|
Design / Build construction of 34,000 SF, 1100 seat ice rink.
Pre-engineered metal building with masonry exterior walls (CMU), pro shop,
skate rental, concession area, arcade, two meeting rooms, and six locker rooms.
Architectural services by Bennetts & Huysman.
|
|
Saint Lawrence Ice Arena
- Massena, NY
|
|
Design / Build construction of 40,000 SF Ice arena for owner's
Finard & Company. Structural steel, masonry block, metal panel roof, 1300 seats.
|
|
Larsen Rink - Winthrop, MA
|
|
Removal of existing refrigeration system and dasher boards. Provide and install new refrigerated concrete floor, underfloor heat grid, new dasher board system, and new humidification system.
|
|